CLEANING AND MAINTENANCE

“Post-installation” cleaning helps remove residues of joint grouts, cement and lime. This operation is mandatory after installation both for glazed and unglazed tiles.

Use warm water and a good quality microfibre cloth. Every now and again, e.g. every 10-20 days depending on the state of the flooring, use neutral detergents diluted with hot water, that are wax-free, and do not deposit glossy films. When the cleaning process in finished always rinse with water, using a second good quality microfibre cloth.

Cleaning and Maintenance Guide

Cleaning and Maintenance Guide

Bare&Bold

Concept

Concept

Deck Plus

Endless

Endless - Margres

Evoke

Evoke

Evolution

Fragment

Hybrid

Hybrid

Linea Cosmos

Linea Cosmos

Linea Endless

Linea Evolution

Linea Prestige

Linea Prestige

Linea Pure Stone

Pure Stone-Margres-Linea

Linea Slabstone

Linea Slabstone

Linea Subway

Linea Subway

Linea Time 2.0

Linea Time 2.0

Linea Tool

Linea Tool

Metropolis

Prestige

Prestige

Pure Stone

Pure Stone-Margres-Linea

Slabstone

Slabstone

Stage

Subway

Tecnica

Tecnica

Thunder

Time 2.0

Time 2.0

Titan

Tool

Tool
Newsletter

Newsletter

Keep up to date with our news! Subscribe to our newsletter.

Accept Cookies

To send a message using the form, you must accept the Functionality Cookies.